West Queue Project 82 — Wind in Meagher, Montana

West Queue Project 82 — Wind in Meagher, Montana is a 600.0 MW wind interconnection project in Meagher, Montana with a current status of active. It is proposed to connect at Future Loco Mt Station for Project #50.

600.0 MWCapacity
ActiveStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 82 — Wind in Meagher, Montana
Queue ID82
Statusactive
Source statusactive
MarketWest
TechnologyWind
Capacity600.0 MW
StateMontana
CountyMeagher
Point of interconnectionFuture Loco Mt Station for Project #50
Requested (queue) date2019-02-20
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata