West Queue Project 83 — Wind in Meagher, Montana
West Queue Project 83 — Wind in Meagher, Montana is a 300.1 MW wind interconnection project in Meagher, Montana with a current status of active. It is proposed to connect at Future Loco Mt Station for Project #50.
300.1 MWCapacity
ActiveStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project 83 — Wind in Meagher, Montana |
|---|---|
| Queue ID | 83 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Wind |
| Capacity | 300.1 MW |
| State | Montana |
| County | Meagher |
| Point of interconnection | Future Loco Mt Station for Project #50 |
| Requested (queue) date | 2019-03-27 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Avista Utilities |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata