West Queue Project 875 — Solar in Fremont, Wyoming

West Queue Project 875 — Solar in Fremont, Wyoming is a 20.0 MW solar interconnection project in Fremont, Wyoming with a current status of withdrawn. It is proposed to connect at Circuit WCM342 out of WAPA Copper Mountain substation.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 875 — Solar in Fremont, Wyoming
Queue ID875
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateWyoming
CountyFremont
Point of interconnectionCircuit WCM342 out of WAPA Copper Mountain substation
Requested (queue) date2017-05-11
Proposed in-service date2018-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata