West Queue Project 879 — Solar in Bonneville, Idaho

West Queue Project 879 — Solar in Bonneville, Idaho is a 1.0 MW solar interconnection project in Bonneville, Idaho with a current status of withdrawn. It is proposed to connect at Circuit CIB11 out of Cinder Butte substation.

1.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 879 — Solar in Bonneville, Idaho
Queue ID879
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity1.0 MW
StateIdaho
CountyBonneville
Point of interconnectionCircuit CIB11 out of Cinder Butte substation
Requested (queue) date2017-05-18
Proposed in-service date2017-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata