West Queue Project 90 — Wind in Uinta, Wyoming
West Queue Project 90 — Wind in Uinta, Wyoming is a 60.0 MW wind interconnection project in Uinta, Wyoming with a current status of operational. It is proposed to connect at Muddy Creek substation.
60.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project 90 — Wind in Uinta, Wyoming |
|---|---|
| Queue ID | 90 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Wind |
| Capacity | 60.0 MW |
| State | Wyoming |
| County | Uinta |
| Point of interconnection | Muddy Creek substation |
| Requested (queue) date | 2006-06-22 |
| Proposed in-service date | 2008-05-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Mountain Wind Power II, LLC |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata