West Queue Project 90 — Solar+Battery in Pima, Arizona

West Queue Project 90 — Solar+Battery in Pima, Arizona is a 400.0 MW solar+battery interconnection project in Pima, Arizona with a current status of active. It is proposed to connect at Pinal West - South Loop 345kV.

400.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 90 — Solar+Battery in Pima, Arizona
Queue ID90
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity400.0 MW
StateArizona
CountyPima
Point of interconnectionPinal West - South Loop 345kV
Requested (queue) date2021-01-27
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata