West Queue Project 928 — Wind in Platte, Wyoming

West Queue Project 928 — Wind in Platte, Wyoming is a 300.0 MW wind interconnection project in Platte, Wyoming with a current status of withdrawn. It is proposed to connect at Foote Creek substation.

300.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 928 — Wind in Platte, Wyoming
Queue ID928
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity300.0 MW
StateWyoming
CountyPlatte
Point of interconnectionFoote Creek substation
Requested (queue) date2017-08-09
Proposed in-service date2020-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata