West Queue Project 94 — Solar in Adams, Washington

West Queue Project 94 — Solar in Adams, Washington is a 5.0 MW solar interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at 13.2 kV south of Othello, WA.

5.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 94 — Solar in Adams, Washington
Queue ID94
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity5.0 MW
StateWashington
CountyAdams
Point of interconnection13.2 kV south of Othello, WA
Requested (queue) date2019-06-17
Proposed in-service date2021-08-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.