West Queue Project 960 — Solar in Uinta, Wyoming

West Queue Project 960 — Solar in Uinta, Wyoming is a 5.0 MW solar interconnection project in Uinta, Wyoming with a current status of withdrawn. It is proposed to connect at Circuit EVA14 out of Evanston substation.

5.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 960 — Solar in Uinta, Wyoming
Queue ID960
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity5.0 MW
StateWyoming
CountyUinta
Point of interconnectionCircuit EVA14 out of Evanston substation
Requested (queue) date2017-10-13
Proposed in-service date2019-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata