West Queue Project 99 — Solar+Battery in Franklin, Washington
West Queue Project 99 — Solar+Battery in Franklin, Washington is a 200.0 MW solar+battery interconnection project in Franklin, Washington with a current status of active. It is proposed to connect at Saddle Mt - Walla Walla 230 kV line.
200.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project 99 — Solar+Battery in Franklin, Washington |
|---|---|
| Queue ID | 99 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 200.0 MW |
| State | Washington |
| County | Franklin |
| Point of interconnection | Saddle Mt - Walla Walla 230 kV line |
| Requested (queue) date | 2019-09-06 |
| Proposed in-service date | 2021-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Avista Utilities |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata