West Queue Project 99 — Battery in Pinal, Arizona

West Queue Project 99 — Battery in Pinal, Arizona is a 319.0 MW battery interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at West Wing 345kV Substation.

319.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project 99 — Battery in Pinal, Arizona
Queue ID99
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyBattery
Capacity319.0 MW
StateArizona
CountyPinal
Point of interconnectionWest Wing 345kV Substation
Requested (queue) date2021-09-28
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.