West Queue Project ANPP HVS-Q25 — Solar+Battery in an unlisted county, the U.S.
West Queue Project ANPP HVS-Q25 — Solar+Battery in an unlisted county, the U.S. is a 306.0 MW solar+battery interconnection project with a current status of operational. It is proposed to connect at Hassayampa 500 kV.
306.0 MWCapacity
OperationalStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project ANPP HVS-Q25 — Solar+Battery in an unlisted county, the U.S. |
|---|---|
| Queue ID | ANPP HVS-Q25 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 306.0 MW |
| State | — |
| County | — |
| Point of interconnection | Hassayampa 500 kV |
| Requested (queue) date | 2018-02-09 |
| Proposed in-service date | 2024-02-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata