West Queue Project CLPT G14 — Solar in Laramie, Wyoming

West Queue Project CLPT G14 — Solar in Laramie, Wyoming is a 150.0 MW solar interconnection project in Laramie, Wyoming with a current status of operational. It is proposed to connect at Sweetgrass 115kV Substation.

150.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project CLPT G14 — Solar in Laramie, Wyoming
Queue IDCLPT G14
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity150.0 MW
StateWyoming
CountyLaramie
Point of interconnectionSweetgrass 115kV Substation
Requested (queue) date2021-05-24
Proposed in-service date2023-12-01
Operational date
Withdrawn date
DeveloperSouth Cheyenne Solar, LLC
Utility / transmission ownerBlack Hills Cheyenne Light Fuel and Power Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata