West Queue Project CLPT G15 — Solar in Laramie, Wyoming
West Queue Project CLPT G15 — Solar in Laramie, Wyoming is a 150.0 MW solar interconnection project in Laramie, Wyoming with a current status of withdrawn. It is proposed to connect at Sweetgrass 115kV Substation.
150.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology
Project facts
| Canonical name | West Queue Project CLPT G15 — Solar in Laramie, Wyoming |
|---|---|
| Queue ID | CLPT G15 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar |
| Capacity | 150.0 MW |
| State | Wyoming |
| County | Laramie |
| Point of interconnection | Sweetgrass 115kV Substation |
| Requested (queue) date | 2021-07-07 |
| Proposed in-service date | 2025-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Cheyenne Light, Fuel and Power Company |
| Utility / transmission owner | Black Hills Cheyenne Light Fuel and Power Transmission |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata