West Queue Project GI-SISS-2025-03 — Battery in Mckinley, New Mexico
West Queue Project GI-SISS-2025-03 — Battery in Mckinley, New Mexico is a 200.0 MW battery interconnection project in Mckinley, New Mexico with a current status of active. It is proposed to connect at Escalante 230kV Substation.
200.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology
Project facts
| Canonical name | West Queue Project GI-SISS-2025-03 — Battery in Mckinley, New Mexico |
|---|---|
| Queue ID | GI-SISS-2025-03 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | New Mexico |
| County | Mckinley |
| Point of interconnection | Escalante 230kV Substation |
| Requested (queue) date | 2025-07-17 |
| Proposed in-service date | 2027-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tri-State Generation and Transmission Association |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata