West Queue Project GI-TC-2021-05 — Solar in Mckinley, New Mexico

West Queue Project GI-TC-2021-05 — Solar in Mckinley, New Mexico is a 200.0 MW solar interconnection project in Mckinley, New Mexico with a current status of operational. It is proposed to connect at PEGS 230kV Station.

200.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project GI-TC-2021-05 — Solar in Mckinley, New Mexico
Queue IDGI-TC-2021-05
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity200.0 MW
StateNew Mexico
CountyMckinley
Point of interconnectionPEGS 230kV Station
Requested (queue) date2021-03-15
Proposed in-service date2023-11-01
Operational date2023-11-01
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata