West Queue Project IA-PNM-2007-10 — Wind in Torrance, New Mexico
West Queue Project IA-PNM-2007-10 — Wind in Torrance, New Mexico is a 700.0 MW wind interconnection project in Torrance, New Mexico with a current status of operational. It is proposed to connect at El Cabo/LaJoya/PacWind.
700.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project IA-PNM-2007-10 — Wind in Torrance, New Mexico |
|---|---|
| Queue ID | IA-PNM-2007-10 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Wind |
| Capacity | 700.0 MW |
| State | New Mexico |
| County | Torrance |
| Point of interconnection | El Cabo/LaJoya/PacWind |
| Requested (queue) date | 2007-06-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata