West Queue Project IA-PNM-2014-01 — Solar+Wind in Guadalupe Cty, New Mexico

West Queue Project IA-PNM-2014-01 — Solar+Wind in Guadalupe Cty, New Mexico is a 300.0 MW solar+wind interconnection project in Guadalupe Cty, New Mexico with a current status of withdrawn. It is proposed to connect at On the BB 345 kV line between Guadalupe and Taiban.

300.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+WindTechnology

Project facts

Canonical nameWest Queue Project IA-PNM-2014-01 — Solar+Wind in Guadalupe Cty, New Mexico
Queue IDIA-PNM-2014-01
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Wind
Capacity300.0 MW
StateNew Mexico
CountyGuadalupe Cty
Point of interconnectionOn the BB 345 kV line between Guadalupe and Taiban
Requested (queue) date2014-02-12
Proposed in-service date2015-12-01
Operational date
Withdrawn date2016-04-21
Developer
Utility / transmission ownerPublic Service Company of New Mexico

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.