West Queue Project IA-PNM-2019-16 — Solar+Battery in Torrance, New Mexico is a 197.5 MW solar+battery interconnection project in Torrance, New Mexico with a current status of withdrawn. It is proposed to connect at Clines Corners 345 kV Switching Station.

197.5 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project IA-PNM-2019-16 — Solar+Battery in Torrance, New Mexico
Queue IDIA-PNM-2019-16
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity197.5 MW
StateNew Mexico
CountyTorrance
Point of interconnectionClines Corners 345 kV Switching Station
Requested (queue) date2019-04-23
Proposed in-service date2024-07-01
Operational date
Withdrawn date2022-05-25
Developer
Utility / transmission ownerPublic Service Company of New Mexico

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.