West Queue Project IA-PNM-2019-23 — Solar+Battery in Luna, New Mexico

West Queue Project IA-PNM-2019-23 — Solar+Battery in Luna, New Mexico is a 24.0 MW solar+battery interconnection project in Luna, New Mexico with a current status of withdrawn. It is proposed to connect at Mimbres ‚Äì Hondale 115 kV Line.

24.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project IA-PNM-2019-23 — Solar+Battery in Luna, New Mexico
Queue IDIA-PNM-2019-23
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity24.0 MW
StateNew Mexico
CountyLuna
Point of interconnectionMimbres – Hondale 115 kV Line
Requested (queue) date2019-04-23
Proposed in-service date2021-12-01
Operational date
Withdrawn date2021-10-22
Developer
Utility / transmission ownerPublic Service Company of New Mexico

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata