West Queue Project NVE — Wind in an unlisted county, Nevada
West Queue Project NVE — Wind in an unlisted county, Nevada is a 200.0 MW wind interconnection project with a current status of unknown. It is proposed to connect at 345kV.
200.0 MWCapacity
UnknownStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project NVE — Wind in an unlisted county, Nevada |
|---|---|
| Queue ID | NVE |
| Status | unknown |
| Source status | unknown |
| Market | West |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Nevada |
| County | — |
| Point of interconnection | 345kV |
| Requested (queue) date | — |
| Proposed in-service date | 2014-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.