West Queue Project Q07a — Solar in an unlisted county, the U.S.

West Queue Project Q07a — Solar in an unlisted county, the U.S. is a 100.0 MW solar interconnection project with a current status of operational. It is proposed to connect at Pinal Central 230 kV.

100.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q07a — Solar in an unlisted county, the U.S.
Queue IDQ07a
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity100.0 MW
State
County
Point of interconnectionPinal Central 230 kV
Requested (queue) date2017-06-15
Proposed in-service date2020-11-30
Operational date2020-11-30
Withdrawn date
Developer
Utility / transmission ownerSRP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata