West Queue Project Q1 — Coal in San Juan, New Mexico is a 700.0 MW coal interconnection project in San Juan, New Mexico with a current status of withdrawn. It is proposed to connect at Four Corners 500 Switchyard.

700.0 MWCapacity
WithdrawnStatus
WestMarket
CoalTechnology

Project facts

Canonical nameWest Queue Project Q1 — Coal in San Juan, New Mexico
Queue IDQ1
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyCoal
Capacity700.0 MW
StateNew Mexico
CountySan Juan
Point of interconnectionFour Corners 500 Switchyard
Requested (queue) date2004-02-24
Proposed in-service date2015-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.