West Queue Project Q12 — Solar+Battery in Maricopa, Arizona
West Queue Project Q12 — Solar+Battery in Maricopa, Arizona is a 500.0 MW solar+battery interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Jojoba 500 kV.
500.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project Q12 — Solar+Battery in Maricopa, Arizona |
|---|---|
| Queue ID | Q12 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 500.0 MW |
| State | Arizona |
| County | Maricopa |
| Point of interconnection | Jojoba 500 kV |
| Requested (queue) date | 2022-04-15 |
| Proposed in-service date | 2025-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata