West Queue Project Q172 — Solar in Yavapai, Arizona

West Queue Project Q172 — Solar in Yavapai, Arizona is a 20.0 MW solar interconnection project in Yavapai, Arizona with a current status of withdrawn. It is proposed to connect at 69 kV tap on line at Pollock Sub.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q172 — Solar in Yavapai, Arizona
Queue IDQ172
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateArizona
CountyYavapai
Point of interconnection69 kV tap on line at Pollock Sub
Requested (queue) date2010-12-21
Proposed in-service date2013-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata