West Queue Project Q214 — Solar in Maricopa, Arizona

West Queue Project Q214 — Solar in Maricopa, Arizona is a 20.0 MW solar interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at 69kV line Broadway and 339 Ave.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q214 — Solar in Maricopa, Arizona
Queue IDQ214
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateArizona
CountyMaricopa
Point of interconnection69kV line Broadway and 339 Ave
Requested (queue) date2012-06-01
Proposed in-service date2014-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.