West Queue Project Q235 — Solar in Maricopa, Arizona

West Queue Project Q235 — Solar in Maricopa, Arizona is a 200.0 MW solar interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Hoodoo Wash Substation 500kV.

200.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q235 — Solar in Maricopa, Arizona
Queue IDQ235
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity200.0 MW
StateArizona
CountyMaricopa
Point of interconnectionHoodoo Wash Substation 500kV
Requested (queue) date2016-03-30
Proposed in-service date2021-07-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata