West Queue Project Q29 — Wind in Cochise, Arizona
West Queue Project Q29 — Wind in Cochise, Arizona is a 100.0 MW wind interconnection project in Cochise, Arizona with a current status of withdrawn. It is proposed to connect at Adams - Mural 115 kV Line.
100.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project Q29 — Wind in Cochise, Arizona |
|---|---|
| Queue ID | Q29 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 100.0 MW |
| State | Arizona |
| County | Cochise |
| Point of interconnection | Adams - Mural 115 kV Line |
| Requested (queue) date | 2007-07-06 |
| Proposed in-service date | 2010-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata