West Queue Project Q323 — Solar in Coconino, Arizona

West Queue Project Q323 — Solar in Coconino, Arizona is a 20.0 MW solar interconnection project in Coconino, Arizona with a current status of withdrawn. It is proposed to connect at Gray Mountain Substation.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q323 — Solar in Coconino, Arizona
Queue IDQ323
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateArizona
CountyCoconino
Point of interconnectionGray Mountain Substation
Requested (queue) date2020-02-18
Proposed in-service date2022-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata