West Queue Project Q339 — Solar+Battery in Yavapai, Arizona
West Queue Project Q339 — Solar+Battery in Yavapai, Arizona is a 53.0 MW solar+battery interconnection project in Yavapai, Arizona with a current status of suspended. It is proposed to connect at Old Home Manor 69kV Substation.
53.0 MWCapacity
SuspendedStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project Q339 — Solar+Battery in Yavapai, Arizona |
|---|---|
| Queue ID | Q339 |
| Status | suspended |
| Source status | suspended |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 53.0 MW |
| State | Arizona |
| County | Yavapai |
| Point of interconnection | Old Home Manor 69kV Substation |
| Requested (queue) date | 2020-03-30 |
| Proposed in-service date | 2022-03-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata