West Queue Project Q339 — Solar+Battery in Yavapai, Arizona

West Queue Project Q339 — Solar+Battery in Yavapai, Arizona is a 53.0 MW solar+battery interconnection project in Yavapai, Arizona with a current status of suspended. It is proposed to connect at Old Home Manor 69kV Substation.

53.0 MWCapacity
SuspendedStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q339 — Solar+Battery in Yavapai, Arizona
Queue IDQ339
Statussuspended
Source statussuspended
MarketWest
TechnologySolar+Battery
Capacity53.0 MW
StateArizona
CountyYavapai
Point of interconnectionOld Home Manor 69kV Substation
Requested (queue) date2020-03-30
Proposed in-service date2022-03-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata