West Queue Project Q35 — Gas in Maricopa, Arizona
West Queue Project Q35 — Gas in Maricopa, Arizona is a 12.0 MW gas interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Luna 69 kV.
12.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology
Project facts
| Canonical name | West Queue Project Q35 — Gas in Maricopa, Arizona |
|---|---|
| Queue ID | Q35 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Gas |
| Capacity | 12.0 MW |
| State | Arizona |
| County | Maricopa |
| Point of interconnection | Luna 69 kV |
| Requested (queue) date | 2014-07-21 |
| Proposed in-service date | 2014-11-14 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.