West Queue Project Q476 — Solar+Battery in Maricopa, Arizona

West Queue Project Q476 — Solar+Battery in Maricopa, Arizona is a 200.0 MW solar+battery interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at 500 kV Redhawk Substation.

200.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q476 — Solar+Battery in Maricopa, Arizona
Queue IDQ476
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity200.0 MW
StateArizona
CountyMaricopa
Point of interconnection500 kV Redhawk Substation
Requested (queue) date2022-09-21
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata