West Queue Project Q48 — Solar+Battery in Pinal, Arizona

West Queue Project Q48 — Solar+Battery in Pinal, Arizona is a 300.0 MW solar+battery interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at Randolph-Abel 230 kV Line.

300.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q48 — Solar+Battery in Pinal, Arizona
Queue IDQ48
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity300.0 MW
StateArizona
CountyPinal
Point of interconnectionRandolph-Abel 230 kV Line
Requested (queue) date2018-09-21
Proposed in-service date2023-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata