West Queue Project Q483 — Battery in Pinal, Arizona
West Queue Project Q483 — Battery in Pinal, Arizona is a 200.0 MW battery interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at New to be constructed 230kV Switchyard near Q343 project (8 miles SE of Santa Rosa 230kV Sub).
Project facts
| Canonical name | West Queue Project Q483 — Battery in Pinal, Arizona |
|---|---|
| Queue ID | Q483 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | Arizona |
| County | Pinal |
| Point of interconnection | New to be constructed 230kV Switchyard near Q343 project (8 miles SE of Santa Rosa 230kV Sub) |
| Requested (queue) date | 2022-09-28 |
| Proposed in-service date | 2026-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Arizona Public Service |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata