West Queue Project Q49 — Solar in Pinal, Arizona

West Queue Project Q49 — Solar in Pinal, Arizona is a 80.0 MW solar interconnection project in Pinal, Arizona with a current status of withdrawn. It is proposed to connect at APS Santa Rosa 69 kV Sub.

80.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project Q49 — Solar in Pinal, Arizona
Queue IDQ49
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity80.0 MW
StateArizona
CountyPinal
Point of interconnectionAPS Santa Rosa 69 kV Sub
Requested (queue) date2008-09-04
Proposed in-service date2013-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.