West Queue Project Q490 — Solar+Battery in Mohave, Arizona

West Queue Project Q490 — Solar+Battery in Mohave, Arizona is a 600.0 MW solar+battery interconnection project in Mohave, Arizona with a current status of withdrawn. It is proposed to connect at Moenkopi-El Dorado 500 kV Line.

600.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q490 — Solar+Battery in Mohave, Arizona
Queue IDQ490
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity600.0 MW
StateArizona
CountyMohave
Point of interconnectionMoenkopi-El Dorado 500 kV Line
Requested (queue) date2022-09-30
Proposed in-service date2026-01-04
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata