West Queue Project Q541 — Other in Maricopa, Arizona

West Queue Project Q541 — Other in Maricopa, Arizona is a 330.0 MW other interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Palm Valley 230kV.

330.0 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project Q541 — Other in Maricopa, Arizona
Queue IDQ541
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity330.0 MW
StateArizona
CountyMaricopa
Point of interconnectionPalm Valley 230kV
Requested (queue) date2023-09-18
Proposed in-service date2026-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata