West Queue Project Q545 — Solar+Battery in Yavapai, Arizona

West Queue Project Q545 — Solar+Battery in Yavapai, Arizona is a 360.0 MW solar+battery interconnection project in Yavapai, Arizona with a current status of withdrawn. It is proposed to connect at Yavapai 500 kV Station.

360.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q545 — Solar+Battery in Yavapai, Arizona
Queue IDQ545
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity360.0 MW
StateArizona
CountyYavapai
Point of interconnectionYavapai 500 kV Station
Requested (queue) date2023-09-27
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata