West Queue Project Q552 — Other in Cochise, Arizona

West Queue Project Q552 — Other in Cochise, Arizona is a 75.0 MW other interconnection project in Cochise, Arizona with a current status of withdrawn. It is proposed to connect at San Pedro - McNeal 69 kV Line (LAT: 31.444942¬∞, LONG: - 109.698603¬∞).

75.0 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project Q552 — Other in Cochise, Arizona
Queue IDQ552
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity75.0 MW
StateArizona
CountyCochise
Point of interconnectionSan Pedro - McNeal 69 kV Line (LAT: 31.444942°, LONG: - 109.698603°)
Requested (queue) date2024-05-02
Proposed in-service date2028-05-05
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata