West Queue Project Q64 — Gas in Pinal, Arizona
West Queue Project Q64 — Gas in Pinal, Arizona is a 17.0 MW gas interconnection project in Pinal, Arizona with a current status of active. It is proposed to connect at Desert Basin 230 kV.
17.0 MWCapacity
ActiveStatus
WestMarket
GasTechnology
Project facts
| Canonical name | West Queue Project Q64 — Gas in Pinal, Arizona |
|---|---|
| Queue ID | Q64 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Gas |
| Capacity | 17.0 MW |
| State | Arizona |
| County | Pinal |
| Point of interconnection | Desert Basin 230 kV |
| Requested (queue) date | 2020-06-19 |
| Proposed in-service date | 2020-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata