West Queue Project Q71 — Gas in Pinal, Arizona

West Queue Project Q71 — Gas in Pinal, Arizona is a 99.0 MW gas interconnection project in Pinal, Arizona with a current status of operational. It is proposed to connect at Desert Basin 230 kV.

99.0 MWCapacity
OperationalStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project Q71 — Gas in Pinal, Arizona
Queue IDQ71
Statusoperational
Source statusoperational
MarketWest
TechnologyGas
Capacity99.0 MW
StateArizona
CountyPinal
Point of interconnectionDesert Basin 230 kV
Requested (queue) date2021-03-18
Proposed in-service date2022-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSalt River Project

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata