West Queue Project Q84 — Solar+Battery in Stevens, Washington

West Queue Project Q84 — Solar+Battery in Stevens, Washington is a 5.0 MW solar+battery interconnection project in Stevens, Washington with a current status of withdrawn. It is proposed to connect at Chewelah 13kV.

5.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q84 — Solar+Battery in Stevens, Washington
Queue IDQ84
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity5.0 MW
StateWashington
CountyStevens
Point of interconnectionChewelah 13kV
Requested (queue) date
Proposed in-service date2026-06-30
Operational date
Withdrawn date2024-02-21
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata