West Queue Project Q99 — Solar+Wind+Battery in White Pine, Nevada

West Queue Project Q99 — Solar+Wind+Battery in White Pine, Nevada is a 800.0 MW solar+wind+battery interconnection project in White Pine, Nevada with a current status of withdrawn. It is proposed to connect at IPP-Gonder 230kV Line.

800.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+Wind+BatteryTechnology

Project facts

Canonical nameWest Queue Project Q99 — Solar+Wind+Battery in White Pine, Nevada
Queue IDQ99
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Wind+Battery
Capacity800.0 MW
StateNevada
CountyWhite Pine
Point of interconnectionIPP-Gonder 230kV Line
Requested (queue) date2023-02-28
Proposed in-service date2029-02-15
Operational date
Withdrawn date2025-07-09
DeveloperIntermountain Power Agency
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.