West Queue Project SGI-PNM-2008-03 — Solar in San Miguel, New Mexico
West Queue Project SGI-PNM-2008-03 — Solar in San Miguel, New Mexico is a 5.0 MW solar interconnection project in San Miguel, New Mexico with a current status of withdrawn. It is proposed to connect at Arriba Project enXco Dev. Corp. Arriba Substation Feeder 12.
Project facts
| Canonical name | West Queue Project SGI-PNM-2008-03 — Solar in San Miguel, New Mexico |
|---|---|
| Queue ID | SGI-PNM-2008-03 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar |
| Capacity | 5.0 MW |
| State | New Mexico |
| County | San Miguel |
| Point of interconnection | Arriba Project enXco Dev. Corp. Arriba Substation Feeder 12 |
| Requested (queue) date | 2008-10-13 |
| Proposed in-service date | 2014-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata