West Queue Project SGI-PNM-2021-41 — Solar in Luna, New Mexico
West Queue Project SGI-PNM-2021-41 — Solar in Luna, New Mexico is a 5.0 MW solar interconnection project in Luna, New Mexico with a current status of withdrawn. It is proposed to connect at Hondale Substation Distribution Feeder 11.
5.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology
Project facts
| Canonical name | West Queue Project SGI-PNM-2021-41 — Solar in Luna, New Mexico |
|---|---|
| Queue ID | SGI-PNM-2021-41 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar |
| Capacity | 5.0 MW |
| State | New Mexico |
| County | Luna |
| Point of interconnection | Hondale Substation Distribution Feeder 11 |
| Requested (queue) date | 2021-08-10 |
| Proposed in-service date | 2023-05-01 |
| Operational date | — |
| Withdrawn date | 2022-02-25 |
| Developer | — |
| Utility / transmission owner | Public Service Company of New Mexico |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata