West Queue Project SGI-PNM-2021-68 — Solar in San Miguel, New Mexico

West Queue Project SGI-PNM-2021-68 — Solar in San Miguel, New Mexico is a 5.0 MW solar interconnection project in San Miguel, New Mexico with a current status of withdrawn. It is proposed to connect at Gallinas Substation Distribution Feeder 11.

5.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project SGI-PNM-2021-68 — Solar in San Miguel, New Mexico
Queue IDSGI-PNM-2021-68
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity5.0 MW
StateNew Mexico
CountySan Miguel
Point of interconnectionGallinas Substation Distribution Feeder 11
Requested (queue) date2021-12-13
Proposed in-service date2023-12-01
Operational date
Withdrawn date2023-01-25
Developer
Utility / transmission ownerPublic Service Company of New Mexico

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata