West Queue Project SP107 — Wind in Coconino, Arizona

West Queue Project SP107 — Wind in Coconino, Arizona is a 161.0 MW wind interconnection project in Coconino, Arizona with a current status of operational. It is proposed to connect at Cedar Mountain - Moenkopi 500 kV Line.

161.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project SP107 — Wind in Coconino, Arizona
Queue IDSP107
Statusoperational
Source statusoperational
MarketWest
TechnologyWind
Capacity161.0 MW
StateArizona
CountyCoconino
Point of interconnectionCedar Mountain - Moenkopi 500 kV Line
Requested (queue) date2023-06-07
Proposed in-service date2024-06-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.