West Queue Project SP111 — Solar+Battery in Pinal, Arizona

West Queue Project SP111 — Solar+Battery in Pinal, Arizona is a 192.0 MW solar+battery interconnection project in Pinal, Arizona with a current status of active. It is proposed to connect at Thornton 69 kV SS.

192.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project SP111 — Solar+Battery in Pinal, Arizona
Queue IDSP111
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity192.0 MW
StateArizona
CountyPinal
Point of interconnectionThornton 69 kV SS
Requested (queue) date
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata