West Queue Project SP113 — Battery in Coconino, Arizona

West Queue Project SP113 — Battery in Coconino, Arizona is a 477.0 MW battery interconnection project in Coconino, Arizona with a current status of withdrawn. It is proposed to connect at APS Chevelon 345 kV Substation.

477.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project SP113 — Battery in Coconino, Arizona
Queue IDSP113
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyBattery
Capacity477.0 MW
StateArizona
CountyCoconino
Point of interconnectionAPS Chevelon 345 kV Substation
Requested (queue) date
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.