West Queue Project TI-08-0312 — Solar in Colfax, New Mexico

West Queue Project TI-08-0312 — Solar in Colfax, New Mexico is a 30.0 MW solar interconnection project in Colfax, New Mexico with a current status of operational. It is proposed to connect at Bison 115 kV Switching Station.

30.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project TI-08-0312 — Solar in Colfax, New Mexico
Queue IDTI-08-0312
Statusoperational
Source statusoperational
MarketWest
TechnologySolar
Capacity30.0 MW
StateNew Mexico
CountyColfax
Point of interconnectionBison 115 kV Switching Station
Requested (queue) date2008-03-12
Proposed in-service date2010-07-10
Operational date2010-07-10
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata